« POPE 5 Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next

Re: Three concrete projects completed this year 

By: ribit in POPE 5 | Recommend this post (2)
Wed, 12 Sep 18 6:02 AM | 38 view(s)
Boardmark this board | Pope 5
Msg. 07672 of 62138
(This msg. is a reply to 07662 by Decomposed)

Jump:
Jump to board:
Jump to msg. #

...pic one of the mailbox good. Pic two of the Tractormometor good. The third thing has got to be an "ET Phone Home" Antenna.




Avatar

Liberals are like a "Slinky". Totally useless, but somehow ya can't help but smile when you see one tumble down a flight of stairs!




» You can also:
- - - - -
The above is a reply to the following message:
Three concrete projects completed this year
By: Decomposed
in POPE 5
Wed, 12 Sep 18 4:19 AM
Msg. 07662 of 62138

I just completed the 3rd project of the summer that required concrete, the first two being a mailbox and a "thermometer" and today's being a clothesline. These were very small concrete pours - each involving fewer than two full bags of Quikrete, but every project winds up being more time consuming than I expect. I'm always happy to have them done.

The clothesline has me disappointed because it's shorter than I had hoped. I stand taller than even its highest lines. That will be a problem if I'm hanging blankets... and maybe if I'm hanging smaller items when the grass is particularly deep. But we bought it (unused) at a garage sale and were taking our chances in exchange for paying close to nothing. No obvious specs were on the box.

It'll still be useful and will save us money every time it's used. But I wish the pole had another foot on it.

Uploaded Image


« POPE 5 Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next