« POPE 5 Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next

Re: DECOMPOSED AND NEMO --Foreclosure For Sale

By: capt_nemo in POPE 5 | Recommend this post (0)
Tue, 29 Jan 19 5:01 AM | 55 view(s)
Boardmark this board | Pope 5
Msg. 21984 of 62138
(This msg. is a reply to 21975 by Decomposed)

Jump:
Jump to board:
Jump to msg. #

And anothere thought DE, If you get inside go to the breaker panel and look for aluminum wire. That should be replaced. It causes many house fires due to its expanding and contracting. Homes started in 1965 with aluminum wire and went to 1973!!!!!!!!!!! Make sure ya look at that also.................




Avatar

Realist - Everybody in America is soft, and hates conflict. The cure for this, both in politics and social life, is the same -- hardihood. Give them raw truth.


- - - - -
View Replies (1) »



» You can also:
- - - - -
The above is a reply to the following message:
Re: DECOMPOSED AND NEMO --Foreclosure For Sale
By: Decomposed
in POPE 5
Tue, 29 Jan 19 4:09 AM
Msg. 21975 of 62138

Nemo:

Re: "Thats exactly what I was thinking DE!!!!!!!!*****"
The realtor says that because of winter, the bank can't do the cleanup of the property until, probably, April or May, and they aren't even going to show it until the cleanup is done. So we've got time to think this over. I do intend to take a look at it, despite the horrid description.

I've been in / lived in a house that was like this before. In California, I lived in a mansion briefly, guarding it while major renovation was being done. I actually trapped NINE feral cats inside the place. They'd been living in it for months... maybe years. Peacocks were in it too. It was pretty awful. One room's entire ceiling was a fungus, and it took two additional guys to carry that soggy carpet out of the room. So I've been in disgusting places before. I'll see how this place compares. It probably really does need to be gutted. The question to answer would be, how long will it take to make part of the place habitable? Cleanup, new floors, Water, hot water, roof and window leaks sealed, insulation added, heat, electricity, septic. That's the bare minimum that would need to be ready by the end of October. If that's not possible, then I'll keep shopping.


« POPE 5 Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next