« 6TH POPE Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next

Re: BREAK TIME, again LOL This took me 4 hours, chezzzzz

By: micro in 6TH POPE | Recommend this post (0)
Sun, 21 Feb 21 5:16 PM | 33 view(s)
Boardmark this board | 6th Edition Pope Board
Msg. 13058 of 60008
(This msg. is a reply to 13034 by capt_nemo)

Jump:
Jump to board:
Jump to msg. #

looks good so far. Question I have is what are the sidewalls on bottom connected to or are they just laying on the ground? Hope not.. Nice job.

micro...


- - - - -
View Replies (1) »



» You can also:
- - - - -
The above is a reply to the following message:
BREAK TIME, again LOL This took me 4 hours, chezzzzz
By: capt_nemo
in 6TH POPE
Sun, 21 Feb 21 2:10 AM
Msg. 13034 of 60008

2 hours would have been dogging it. Just dont have it anymore. Put the skip sheeting on then the metal roof, then finish inside with gable braces and cat walk. Snow wont phaze this one. Cant believe the cost $800. Wood has went through the roof here.

I tell ya it felt really good to build something again. I enjoyed building things........

Uploaded Image

Uploaded Image

Uploaded Image

Uploaded Image


« 6TH POPE Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next