« 6TH POPE Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next

Home Update 

By: De_Composed in 6TH POPE | Recommend this post (1)
Wed, 10 Jul 24 1:40 AM | 26 view(s)
Boardmark this board | 6th Edition Pope Board
Msg. 54947 of 60008
Jump:
Jump to board:
Jump to msg. #

The front porch is finally enclosed. A landing, if that's what it's called, and permanent steps are still needed before the front and side doors. Downstairs, the synthetic floor and the baseboards still need to be put in. The floor is scheduled for August 19th.

Then, except for some little things, this forever house is complete and I can die.




» You can also:
« 6TH POPE Home | Email msg. | Reply to msg. | Post new | Board info. Previous | Home | Next